Page 2 of 5

Re: Errata..??

Posted: Fri 30 Jun 2017, 23:05
by Doctor KoT
I just begun to calculate the ready-to-go ships, and my numbers does not match with numbers from the book:
p.156, Scarab
standard model: COST: 1 462 500 birr
passenger ship: COST: 1 430 000 birr
blockade runner: COST: 1 735 000 birr
p.157, Azuk
standard model: MANEUVERABILITY: -1, COST: 1 605 000 birr (also there is 3 unused modules -- its better to point that out, no?)
patrol ship: SIGNATURE: 0, SPEED: 3, COST: 1 730 000 birr (also 3 unused modules)
flying circus (wich is, i suppose, must be assault ship): HULL POINTS: 6, SIGNATURE: 0,  COST: 1 595 000 birr (3 unused modules (one of them is weapon-only)

Re: Errata..??

Posted: Sat 01 Jul 2017, 11:21
by Doctor KoT
p.158, Oryx
standard model: SIGNATURE: +1, COST: 1 622 500
patrol shipSIGNATURE: +1, COST: 1 712 500 (also, hangar module for space scooter is missing)
express freighterSIGNATURE: +1, COST: 1 592 500

Re: Errata..??

Posted: Sat 01 Jul 2017, 14:48
by Doctor KoT
p.159, Kamruk
mining model: ARMOR: 5, COST: 3 582 500 (6 unused modules)
salvage model: HULL POINTS: 11, ARMOR 5, COST: 3 432 500 (8 unused modules)
flying circusARMOR: 5, COST: 2 892 500 (4 unused modules, 1 unused feature)

Re: Errata..??

Posted: Sat 01 Jul 2017, 16:17
by Doctor KoT
p.160
shuttle: COST: 240 000
corsair ship: MANEUVERABILITY: +0, COST: 1 440 000

Re: Errata..??

Posted: Sat 01 Jul 2017, 17:16
by Doctor KoT
p.161
destroyer: COST3 885 000

Please, tell me if i'm messed up somewhere.

Re: Errata..??

Posted: Wed 12 Jul 2017, 11:51
by Tomas
Thanks for this, we'll look into it!

Re: Errata..??

Posted: Wed 23 Aug 2017, 02:58
by Ansalander
Core book, first printing:

The Scarab, Blokcade Runner variant is also short one of its ten allowed modules. I suggest another module of cabins because it has a crew of 5 and has only one cabin module (4 cabins if standard cabins). It also lacks the atmospheric entry feature. I suppose atmo entry may not be absolutely necessary for some uses, but seems to me like it may have been omitted. If both are added, I've got the cost Figured at 1,845,000 birr (that's building the ship from scratch, not merely adding to book values).

Re: Errata..??

Posted: Mon 28 Aug 2017, 21:59
by Doctor KoT
1,845,000 birr
I've got 1 875 000 with this ship calculator  and with my own excel table

Re: Errata..??

Posted: Mon 23 Oct 2017, 04:39
by JargogleBamboozle
Because folks need a document they can use at the table, or print off and slide inside the cover of their rulebook, I've put the errata into a much more user-friendly Word document. If someone can spruce it up and make it cooler-looking, that would be appreciated, thanks. You can download it HERE.

Re: Errata..??

Posted: Mon 23 Oct 2017, 08:16
by Tomas
Nice! An errata sheet is on our todo-list.